After launch: a maintenance checklist that closes the gaps
Domains, backups, forms and updates: organise website maintenance without turning every incident into an emergency.

Launch is visible. Maintenance is less visible until an enquiry stops arriving or a domain renewal is missed. A website may still display while an important operational part has already failed.
Identify critical components, owners and a reasonable review routine before the project ends, even when maintenance is a separate agreement.
Know who owns each service
Inventory the domain, hosting, mail service, measurement tools and integrations. Record the account owner, operational contact and renewal date. Important services should not depend solely on an address that disappears when a colleague leaves.
Handover is more than a folder of passwords. It includes access recovery, account ownership and permissions. Sensitive access should use suitable channels, never public screenshots or documents.
Test the enquiry journey
Open an important page, send a fictional enquiry and verify receipt. Application acceptance, server processing and final delivery are separate events.
| Indicative occasion | Check | Useful record |
|---|---|---|
| After a change | Relevant desktop and mobile journey | Change and verification notes |
| Regularly | Form and message receipt | Date of the last test |
| Before expiry | Domain and essential subscriptions | Renewal owner |
| According to changes | Backup and trial restoration | Restoration result |
The appropriate frequency depends on the business and risks. A payment platform requires different attention from a simple presentation site.
Verify restoration
A backup file is not proof that recovery will work. Check its contents, storage and relationship to application files and configuration. Test recovery in an isolated environment so current records cannot be overwritten accidentally.
Discuss acceptable data loss between backups and acceptable downtime. These decisions determine the recovery approach.
Update with a way back
Each update needs a purpose, owner and verification method. Prepare a backup or rollback version, test in an appropriate environment and review affected journeys.
For background processing, the Celery task documentation illustrates why errors, timeouts and retries matter. An interface can appear normal while queued work has stopped.
Separate incidents and improvements
- Incident: an agreed action no longer works.
- Maintenance: keep the system usable and updated within the agreed scope.
- Evolution: add or change behaviour for a new requirement.
A short operational document should list critical tasks, contacts, renewal dates and recovery procedures. Update it after important changes so a competent colleague can understand the system without reconstructing every decision.
For an existing website, start with a page audit and a conversation about critical operations. Our web service can help distinguish repair, maintenance and a new release.

